project alignment
Route
route:project-alignment
What this page is
This is an FPF route: a curated working path through pattern IDs. It is not a website route or application navigation route.
Methodology
Use the ordered steps as the first path through the framework. Treat optional steps, landing points, route surfaces, and reroutes as controls for scope, ownership, and common wrong turns. Open exact pattern pages only when the work depends on their wording.
Use this route when
The live burden is: A shared project kickoff packet needs the bounded context, role/method/work split, first work item, and adoption evidence without loading the whole FPF
First route for project kickoff, project information-system alignment, or agent work packets when roles, method, work, and adoption next steps must stay separate.
Copyable compact prompt
Ordered steps
- A.1.1 Bounded Model-Use Structure: Applicability, Use and Expression Coherence (DDD Bounded Context)
- A.15 System-Role–Method–Work Alignment
- B.5.1 Coordinate Development States: Explore → Shape → Evidence → Operate
Optional steps
- A.15.2 U.WorkPlan: Plan Content for Coordinating Future Work
- A.15.3 SlotFillingsPlanItem: Plan a Value for an Existing Declaration Member
Landing points
Route surfaces
- A.1.1 Bounded Model-Use Structure: Applicability, Use and Expression Coherence (DDD Bounded Context)
Typical next owners
Citations
fpf-reference-adoption-overlay:project-alignment
Last Updated: 2026-10-12 — upstream FPF commit f2bc67dd (github.com/ailev/FPF)